Product Details:
Payment & Shipping Terms:
|
Material: | Gallium Oxide | Appearance: | Powder |
---|---|---|---|
Main Application: | LED Fluorescent Powder | CAS: | 12024-21-4 |
Purity: | 99.999% | Color: | White |
Certification: | ISO9001 | Type: | 5N |
High Light: | pure gallium metal,gallium powder |
99.999% 5N High Purity Gallium Oxide , Gallium Dioxide For LED Fluorescent Powder
1. Purity :99.999% 5n gallium oxide
2. CAS No.:12024-21-4
3. Main application: semiconductor ,LED Fluorescent powder
Gallium and its series products from wuhan xinrong:
Material name |
Purity |
high purity gallium |
6N-7N-8N |
gallium metal |
4N-5N |
gallium trioxide (Ga2O3) |
4N-5N |
2. GENERAL PROPERTIES
Gallium trioxide (Ga2O3) is used as a phosphor in light emitting diodes, as well as in lasers and other luminescent materials. Although it can be prepared in both α and β crystal phases, the stable β-Ga2O3 is more commonly used in commercial applications .
3. Specification
Impurities in ppm
Element | Standard | Result |
Ca | ≤1.0 | 0.5 |
Co | ≤0.5 | 0.5 |
Cr | ≤1.0 | 0.5 |
Cu | ≤1.0 | 0.7 |
Fe | ≤1.5 | 1.5 |
In | ≤1.0 | 1.0 |
Mn | ≤0.5 | 0.5 |
Na | ≤1.5 | 1.3 |
Ni | ≤0.5 | 0.5 |
Zn | ≤1.5 | 0.5 |
Others Each | ≤2.0 | 1.0 |
Ga2O3 | 99.999% |
4. Packing
Generally packed in 1 kg/bag or bottle, also could do according to customer request.
First step: |
Packed in vacuum polyester bag/ plastic bag. |
Second step: |
Packed in vacuum polyester bag or aluminum foil bag again. |
Third step: |
Wrapped with bubble, load to the carton and seal the carton |
5. Shipping
Preparation time before shipping |
If we have stock, we could delivery the material in 3-5 days after customer confirmed the PO |
If we do not have stock, we could delivery the material in 7-15 days according to customer purchased quantity. |
Cargo shipping time: |
If the material is delivery by express, it takes 3-6 days to arrive at the destination place. |
If the material is shipped by air, it takes 3-6 days to arrive in the destination air port. |
If the material is shipped by sea, it takes 10-40 days to arrive in the different countries sea ports |